Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
light rail

Expo Releases FEIR for Phase II Chooses Alignment Along ROW and Colorado Avenue

12_18_09_expo_map.jpgThe Source has a full sized map here.

The Expo Construction Authority has finally released the Final Environmental Impact Statement for Phase II of the Expo Line with some key changes.  I'll spend more time reviewing the document and talking to some of the key players in the drama over the weekend and will be back with a longer story on Monday.  But for those of you that can't wait to start talking, here are the key changes from the press release, which can be read in its entirety here.  Or you can read the environmental documents in their entirety on the Expo Construction Authority Board website.

Meanwhile, here are the key changes from the Draft EIR per the Construction Authority's Press Release.

Inclusion of a design option that removes the park-and-ride lot at the Westwood station;

AMaintenance Facility design option which includes Santa Monica Collegeand Verizon properties with a 100-110 foot buffer, providing additionalprotection from the residential community to the south of the proposedfacility;

Accommodation of a continuous bikeway from the Phase 1 terminus to Santa Monica;

An additional grade separation at Centinela;

Addition of a 3rd northbound lane on Sepulveda for the at-grade crossing;

Inclusion of a design option for grade separation at Sepulveda if outside funding sources become available.

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Kevin de León’s Cynical CD14 Debate Performance Shows How Little He’s Grown

De León repeatedly accused Jurado of being a liar who lacked substantive accomplishments while taking credit for a number of projects initiated prior to his tenure.

October 16, 2024

SGV Connect 129: Looking at Measures A and G

Both ballot measures need a simple majority to pass. SGV Connect will be back after the election to review what voters decided locally, regionally and across the state.

October 16, 2024

Metro Weekday Ridership Surpasses One Million

Metro ridership is at 86 percent of pre-pandemic levels, well ahead of the nationwide average of 76 percent

October 16, 2024

This Week In Livable Streets

Metro 405 Freeway widening meeting, weekend Metro A Line closures (Duarte to Azusa), Metro Rail to Rail path construction, and more

October 15, 2024
See all posts