Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
Bicycling

LADOT Following Up on 2009 Promise, More Bike Lanes on Reseda, Rinaldi in the Valley

New Bike Lanes on Reseda and Rinadli in the Valley.  Image: LADOT Bike Blog
New Bike Lanes on Reseda and Rinadli in the Valley. Image: LADOT Bike Blog

Yesterday, the LADOT Bike Blog announced two new bike lane projects that were completed in the Valley this weekend.

On Rinaldi Street 1.3 miles of bike lanes were added over the weeked that closed a gap between two existing sets of lanes were completed for a continuous eight miles from Laurel Canyon Road to Mason Avenue.  Reseda Boulevard still has a .9 mile gap in its bike lane, but that gap was over halved with the painting of a 1.1 mile stretch from Valerio Street in the south to Roscoe Boulevard in the north.

While its certainly good news that the Valley is getting a better bike network, it's also good to see the LADOT keeping its promise to paint the lanes on Reseda and Rinaldi.  Back in April of 2009, the Department had a bit of a public relations problem when plans surfaced that existing bike lanes on Reseda Boulevard would be removed to create more peak hour car capacity.

LADOT complained they were victim of a rumor that was being spread and that they were never considering such a thing.  As the Bike Advisory Committee Chair, Glenn Bailey, and the Los Angeles County Bicycle Coalition turned up the heat and the LADOT promised that in the next couple of years the gaps on Reseda Boulevard and Rinaldi Street would be completed.

Some of the lanes were completed almost immediately.  More were painted immediately before the Mayor's Bike Summit.  And now a third set were painted and Rinaldi Street features an eight mile continuous Bike Lane.  Of course, any racer will tell you that the last miles is the hardest.  LADOT has .9 miles left.

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Kevin de León’s Cynical CD14 Debate Performance Shows How Little He’s Grown

De León repeatedly accused Jurado of being a liar who lacked substantive accomplishments while taking credit for a number of projects initiated prior to his tenure.

October 16, 2024

SGV Connect 129: Looking at Measures A and G

Both ballot measures need a simple majority to pass. SGV Connect will be back after the election to review what voters decided locally, regionally and across the state.

October 16, 2024

Metro Weekday Ridership Surpasses One Million

Metro ridership is at 86 percent of pre-pandemic levels, well ahead of the nationwide average of 76 percent

October 16, 2024

This Week In Livable Streets

Metro 405 Freeway widening meeting, weekend Metro A Line closures (Duarte to Azusa), Metro Rail to Rail path construction, and more

October 15, 2024
See all posts