Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
Foothill Extension

Foothill Gold Line Conference Builds Momentum To Extend

xxx
"The Journey Continues" was a theme of today's Foothill Gold Line conference. Pictured (left to right) are Metro board chair John Fasana, Construction Authority CEO Habib Balian and Chief Project Officer Chris Burner and Metro Deputy CEO Stephanie Wiggins. Photo: Joe Linton/Streetsblog L.A.
xxx

The Metro Gold Line Foothill Extension Construction Authority hosted a one-day State of the Project 2016 conference today at Pomona College. Elected officials, agency leaders and others gathered to hear some success stories from previous segments, but mostly to look ahead to extending the Gold Line eastward to Montclair, and possibly further.

Screen Shot 2016-07-07 at 7.05.37 PM

The Foothill Gold Line's next phase eastward, referred to as phase 2B, would extend 12.3 miles to just outside the L.A. County border with San Bernardino County. Stations would be located in Glendora, San Dimas, La Verne, Pomona, Claremont and Montclair. The phase already has environmental clearance, and the construction authority's board recently approved engineering designs.

At today's event, construction authority leadership shared characteristics of the Glendora to Montclair extension. The phase is anticipated to cost $1.2 billion, of which still needed are $1.15 billion from L.A. County and $63 million from San Bernardino County. There will be four times more station parking than the prior Pasadena to Azusa segment. The new light rail runs in the same right-of-way as BNSF and Metrolink trains, hence there will complicated relocation of tracks to make space. The light rail stations will be in the middle of the tracks, making for less confusion for riders, but also necessitating some pedestrian under- and over-crossings.

That next extension dominated the conversation, but what really hung over the conference was Measure M, Metro's sales tax which goes to L.A. County voters on November 8th. 

If passed, Measure M will fully fund the Gold Line within L.A. County. The mayor of L.A. Eric Garcetti and three congressmembers - Garce Napolitano, Judy Chu, and Norma Torres - all stressed the importance of passing Measure M. Congressmember Chu called Measure M "the one great hope" for extending the Gold Line. Torres spoke on the need for inter-county cooperation to get the line to Ontario Airport. All emphasized that everyone present should not only vote for Measure M, but get the word out to friends, family, and others. Congressmember Napolitano joked that Mayor Garcetti should have brought and handed out lists of voters for people in the room to call in the coming weeks.

Perhaps most telling was Construction Authority CEO Habib Balian's response to Metro Chair John Fasana's question about any possible Plan B. What is the back up plan for the Gold Line if Measure M does not pass? Bailan, who had been speaking enthusiastically, responded more quietly that there might be some federal funding, but that would likely delay the project 30 years, or maybe state cap-and-trade funds, but those have been faltering recently.

If Measure M passes, phase 2B of the Gold Line is ready and should be among the earliest projects underway. If Measure M fails to get the necessary two-thirds, the future of the Gold Line is a whole lot less clear.

SBLA coverage of San Gabriel Valley livability is supported by Foothill Transit, offering car-free travel throughout the San Gabriel Valley with connections to the new Gold Line Stations across the Foothills and Commuter Express lines traveling into the heart of downtown L.A. To plan your trip, visit foothilltransit.org. “Foothill Transit. Going Good Places.”

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Kevin de León’s Cynical CD14 Debate Performance Shows How Little He’s Grown

De León repeatedly accused Jurado of being a liar who lacked substantive accomplishments while taking credit for a number of projects initiated prior to his tenure.

October 16, 2024

SGV Connect 129: Looking at Measures A and G

Both ballot measures need a simple majority to pass. SGV Connect will be back after the election to review what voters decided locally, regionally and across the state.

October 16, 2024

Metro Weekday Ridership Surpasses One Million

Metro ridership is at 86 percent of pre-pandemic levels, well ahead of the nationwide average of 76 percent

October 16, 2024

This Week In Livable Streets

Metro 405 Freeway widening meeting, weekend Metro A Line closures (Duarte to Azusa), Metro Rail to Rail path construction, and more

October 15, 2024
See all posts