Skip to Content
Streetsblog Los Angeles home
Streetsblog Los Angeles home
Log In
bicycle lanes

Huizar Cuts Ribbon on El Sereno’s Alhambra Avenue Safety Improvements

The Alhambra Avenue Safety Improvements include 1.5 miles of new road diet bike lanes. Photos by Joe Linton/Streetsblog L.A.

18-2925_ad_PLE_centurycity_digitalads_mir_728x90

This story sponsored by Los Angeles Metro to remind readers of traffic pattern changes resulting from Purple Line Construction. Unless noted in the story, Metro is not consulted for the content or editorial direction of the sponsored content.

Just over a week ago, El Sereno leaders joined L.A. City Councilmember José Huizar and city staff to cut the ceremonial ribbon on the Alhambra Avenue Safety Improvements project.

Councilmember Huizar (center light blue shirt) with El Sereno community leaders cutting the ribbon on the Alhambra Avenue Safety Improvements
Councilmember Huizar (center light blue shirt) with El Sereno community leaders cutting the ribbon on the Alhambra Avenue Safety Improvements
Councilmember Huizar (center light blue shirt) with El Sereno community leaders cutting the ribbon on the Alhambra Avenue Safety Improvements

The $1.2 million project broke ground in January. It extends 1.5 miles along Alhambra Avenue from Valley Boulevard to the city limit just east of Lowell Avenue.

The improvements are most dramatic from Lowell Avenue to the city border with unincorporated East L.A. This area, adjacent to the El Sereno Arroyo Playground, has an S-curve that neighbors report has been crash-prone. There were no sidewalks there. On the north side of the street there was a dirt path below a crumbling dirt slope.

Before: Alhambra Avenue at Lowell Avenue. Image via Google street view
Before: Alhambra Avenue at Lowell Avenue. Image via Google street view
Before: Alhambra Avenue at Lowell Avenue. Image via Google street view

The city added a new signal at Lowell, a new sidewalk and retaining wall, and extended curbside crash barriers.

After: Alhambra Avenue at Lowell last week
After: Alhambra Avenue at Lowell last week
After: Alhambra Avenue at Lowell last week
View of the Alhambra Avenue S-curve after improvements
View of the Alhambra Avenue S-curve after improvements
View of the Alhambra Avenue S-curve after improvements
AlhambraAv318Aug9
The eastbound portion of the Alhambra Avenue S-curve has a short stretch of buffered bike lane
The eastbound portion of the Alhambra Avenue S-curve has a short stretch of buffered bike lane
Alhambra Avenue's bike lane ends at the East L.A. limit where Alhambra becomes W. Mission Road
Alhambra Avenue's bike lane ends at the East L.A. limit where Alhambra becomes W. Mission Road
Alhambra Avenue's bike lane ends at the East L.A. limit where Alhambra becomes W. Mission Road

The project included resurfacing Alhambra Avenue with a road diet lane reduction on Alhambra Avenue from Valley Boulevard to Lowell. Four travel lanes were reduced to two, with a center turn lane and bike lanes added.

Center turn lane and bike lanes were added to 1.5 miles of Alhambra Avenue
Center turn lane and bike lanes were added to 1.5 miles of Alhambra Avenue
Center turn lane and bike lanes were added to 1.5 miles of Alhambra Avenue

One remaining component of the project is still being installed: a new flashing-lights crosswalk at Hollister Avenue. Last week, L.A. City Transportation Department (LADOT) crews were installing the new crosswalk signal hardware.

LADOT installing new crosswalk signal on Alhambra Avenue at Hollister Avenue
LADOT installing new crosswalk signal on Alhambra Avenue at Hollister Avenue
LADOT installing new crosswalk signal on Alhambra Avenue at Hollister Avenue

Stay in touch

Sign up for our free newsletter

More from Streetsblog Los Angeles

Kevin de León’s Cynical CD14 Debate Performance Shows How Little He’s Grown

De León repeatedly accused Jurado of being a liar who lacked substantive accomplishments while taking credit for a number of projects initiated prior to his tenure.

October 16, 2024

SGV Connect 129: Looking at Measures A and G

Both ballot measures need a simple majority to pass. SGV Connect will be back after the election to review what voters decided locally, regionally and across the state.

October 16, 2024

Metro Weekday Ridership Surpasses One Million

Metro ridership is at 86 percent of pre-pandemic levels, well ahead of the nationwide average of 76 percent

October 16, 2024

This Week In Livable Streets

Metro 405 Freeway widening meeting, weekend Metro A Line closures (Duarte to Azusa), Metro Rail to Rail path construction, and more

October 15, 2024
See all posts